
Thornhill — Basement Renovation — 2024
Royal Orchard Lower-Level Suite
Project Data
- Size
- 2,200 sq ft
- Duration
- 14 weeks
- Scope
- Lower-level renovation, secondary suite
- Year
- 2024
- City
- Thornhill
- Service
- Full Basement Renovation
A Thornhill lower level rebuilt as a self-contained in-law suite: kitchenette, lounge, spa bath and a glass-walled gym.
Window wells were enlarged and egress windows installed so every room meets the Ontario Building Code for a secondary suite, with a separate side entrance and fire separation to the main floor.
The suite runs a full kitchenette in rift-cut white oak with integrated appliances, a lounge on wide-plank oak, a spa bathroom with heated floors and a glass partition to a compact home gym.
Moisture management came first — full perimeter waterproofing, a redundant sump system and conditioned air sized for the new occupancy keep the lower level dry and comfortable year-round.
Ready for Work at This Level?
Walk us through your property and ambitions — we respond within one business day.



